VietlawOnline

blue-check Construction norms applicable from October 15th, 2021

Circular No. 12/2021/TT-BXD dated August 31st, 2021 of the Ministry of Construction on construction norm
Posted: 7/9/2021 3:07:03 PM | Latest updated: 8/7/2022 1:06:50 PM (GMT+7) | LuatVietnam: 5288 | Vietlaw: 529
VietlawOnline

This Circular is to replace all current construction norms, including:

1. Construction survey estimate norms under Annex I;

2. Construction estimate norms under Annex II;

3. Technical installation estimate norms under Annex III;

4. Technology machinery and equipment installation estimate norms under Annex IV;

5. Construction experiment estimate norms under Annex V;

6. Construction repair and maintenance estimate norms under Annex VI;

7. Construction material use norms under Annex VII;

8. Construction project management and consulting cost norms under Annex VIII.

This Circular takes effect from October 15th, 2021.

The construction norms promulgated together with this Circular replace the construction norms promulgated together with Circular No. 10/2019/TT-BXDstatus1 dated December 26th, 2019; Circular No. 16/2019/TT-BXDstatus1 dated December 26th, 2019, and replace Annex II at Circular No. 02/2020/TT-BXDstatus1 dated July 20th, 2020.

Notes
Please be noted that the attachments are neither translated nor included in the English file.
Admin_05

Related documents

Penalty document

Unknown

Information

Effective Date 15-Oct-2021
ExpiredDate Unknown
Published Vietlaw's Newsletter No. 529

Files attachment

enflag wordicon TT12-31082021BXD[E].docx

Timeline

Construction

blue-check Issue relating to payment for warranty of construction works
blue-check From August 8th, 2022: Fee for grade adjustment to certificate of construction capacity shall be increased to 1,000,000 VND
blue-check It is required to ensure the net building density for construction of factories not exceeding 70%
blue-check
blue-check Issue relating to completion of construction works
blue-check Regarding application of foreign standards to construction works in Vietnam
blue-check How to calculate costs for making feasibility study report and construction design costs
blue-check Regarding regulations on calculation of costs of appraisal of construction projects
blue-check Some notes upon liquidation of a construction contract due to the contractor’s breach in the contract
blue-check Regarding modification of categories, origin in a construction contract
blue-check Order of priority application of documents enclosed with a construction contract
blue-check Investor has the right to unilaterally terminate the contract if the contractor delays construction work for 56 consecutive days
blue-check A Joint Stock Company with less than 50% state capital shall not comply with the Law on public investment
blue-check Regarding construction permit for construction of works in industrial clusters
blue-check Requirements upon making fire prevention and fighting designing for works according to foreign standards
blue-check Criteria for structures permitted for construction in HCMC amid Covid-9
blue-check Construction norms applicable from October 15th, 2021
blue-check New methods for determination of construction investment costs
blue-check Regulations on management of occupational safety and health of construction projects
blue-check Regarding application of foreign standards in construction activities in Vietnam