Official letter No. 3939/BXD-GD dated September 23rd, 2021 of the Ministry of Construction regarding some issues in construction activities
Posted: 8/10/2021 10:14:35 AM | Latest updated: 11/11/2021 8:00:32 AM (GMT+7) | LuatVietnam: 5311 | Vietlaw: 536
VietlawOnline

According to clause 3 Article 7 of Decree No. 06/2021/ND-CP, in case entering into a consortium, contractors as members of the consortium shall assume responsibility for the quality of the works they perform as defined in the written partnership agreement and the construction contract.

Accordingly, contractor A’s asking contractor B in a consortium for signing to certify quality of part of work performed by contractor A is considered to be inappropriate.

Regarding grading of housing works, if blocks A, B and C do not have the same foundation, these blocks are considered to be independent construction works of a project. It is required to separately grade each block based on structure scale.

In contrast, of blocks A, B and C have the same foundation, works grade is determined according to the structure scale with these criteria: height; number of stories; total floor area; largest structural span; underground depth; number of basements. In which, the criterion of total floor area is determined the total construction area of the blocks and construction area of the basement.

Ms Phuong Thao (VietlawOnline.com)
Please tag VietlawOnline.com when reposting this article
Related documents
Not found
Penalty document
Unknown
Information
Effective Date Unknown
ExpiredDate Unknown
Published Vietlaw's Newsletter No. 536
Files attachment
enflag pdficon CV3939-23092021BXD[VLO].pdf
Timeline
No data

Building construction